Bristol City Centre Flood Alleviation Scheme

Client:Wessex Water
Contractor:Wessex Engineering Services Limited/Specialist Engineering Services Limited
Contract Value:£10 million

Key Features

  • Design of 850m hard rock tunnel
  • Excavation by drill and blast
  • Design includes drive pit and deep level shaft connection
  • Hydraulic design
  • CDM Co-ordinator