

Ripple Road Flyover, CTRL
| Client: | Union Railways North |
|---|---|
| Contractor: | Nuttall/Wayss/Freytag/Kier JV |
| Value: | Not disclosed |
Key Features
- Determining the existing FOS of the bridge
- Assessment of various options for replacement of lost capacity
- Developing the preferred solution, a ground engineering design, by working closely with specialist sub-contractor
- Settlement predictions and assessing capacity of bridge
- Developing and designing mitigation measures







